Building sponsor: Dubai Civil Aviation Authority
Architecture: International Bechtel Limited
Lighting design: Horten & Lee Associates
Main contractor: Al Habtoor MurrayRoberts
Electrical installation: Thermo LLC
Completion: April 2000
5 levels
800 m long
148,200 m²
Passenger capacity: 22 million/year
Internet:
www.dubaiairport.com