Putna Monastery
This project - ERCO's first ever in Romania - was managed by our offices in Budapest together with ProEnerg, an electrical store and installation company from Oradea. To enable efficient planning despite the great spatial separation, different lighting concepts were simulated and analysed in a virtual model of the church interior with the help of the relevant luminaire data records.
In this way, the designers were able to ascertain the optimum positions for the luminaires, positions that also ensured unobtrusive installation with minimum intrusion into the fabric of the building.