myERCO
myERCO
Your free myERCO account allows you to mark items, create product lists for your projects and request quotes. You also have continuous access to all ERCO media in the download area.
You have collected articles in your watchlist
Technical environment
Technical environment
Global standard 220V-240V/50Hz-60Hz
Standard for USA/Canada 120V/60Hz, 277V/60Hz
  • 中文

Our contents are shown to you in English. Product data is displayed for a technical region using 220V-240V/50Hz-60Hz.

More user friendliness for you
ERCO wants to offer you the best possible service. This website stores cookies for this purpose. By continuing to use this website, you consent to the use of cookies. For more information, please read our privacy policy. If you click on "Do not agree", essential cookies will continue to be set. Certain contents of external pages can no longer be displayed.

BMW Plant Leipzig, Central Area

The bare chassis silently meander right through the offices at the BMW works in Leipzig: Zaha Hadid designed this spectacular link building between the shop floors which reflects the dynamics of the marque in both architecture and lighting.

BMW Plant Leipzig, Central Area
BMW Plant Leipzig, Central Area
BMW Plant Leipzig, Central Area

The thoroughfares are very generously proportioned since the entire workforce has to use them at the start and finish of the shifts. Light is also used here to add structure to the bare concrete surfaces: double-focus downlights for metal halide lamps illuminate these thoroughfares with precisely scalloped beams providing high visual comfort. This results in contrasting zones – zones in which the intensive, coloured light of blue metal halide lamps is once again used, only this time fitted in lens wallwashers in order to tone the wall zones with an absolutely even colour.

BMW AG
Werk Leipzig
BMW Allee 1
04349 Leipzig

www.bmwgroup-werke.com/leipzig/en.html

Architects:
Zaha Hadid with Patrik Schumacher, London
www.zaha-hadid.com

Lighting design:
Equation Lighting Design, London

Gross floor area: 27,000 m²
Construction start: 2002
Completion: 2004
Official opening: May 2005

ERCO Newsletter - inspiring projects, new products and fresh lighting knowledge

Subscribe to the newsletter
Your data will be handled confidentially. For further information see Data protection declaration
From now on, for convenience and speed, we will be emailing the ERCO Newsletter in a digital format on a regular basis to help you keep up with the latest news from ERCO. We aim to ensure that you’re updated about events, awards, fresh lighting knowledge, project reports and product news along with reports from the lighting and architectural sectors. The publication is free and you can unsubscribe at any time.